New-build inspections.
An independent check of a high-end new apartment before you accept handover from the developer. In English, by a structural engineer.
32 reviews on Facebook. 100% recommend.
Know before you take the keys.
A new apartment should be handed over complete and free of defects. In my experience it rarely is. I inspect it before you take possession and give you a clear, independent record of what is defective, damaged or unfinished, with the action needed for each item, so that the developer can put it right.
It is commonly known as a snagging inspection. I carry out each inspection myself.
- The apartmentOne visual, non-intrusive inspection of the apartment, its balconies, and any parking and storage sold with it.
- DefectsThe defects, damage and incomplete work I find on the day. Each item is photographed, located by room and given a recommended action.
- Room sizesMeasured, and checked against the sale plans you send me in advance.
- SystemsA high-level check of every visible and accessible outlet and system: electrics, plumbing and air-conditioning, where they are installed and connected on the day.
- The listA summary schedule in English and Hebrew, so that it can be passed directly to the developer.
This page is a summary. What is inspected at your apartment is set out in the fee proposal and its scope, limits and terms, which you agree before the inspection.
From sale plans to the developer's list in five steps.
- 1
You send me the details
The property details and the sale plans, by WhatsApp or email.
- 2
I send a fee proposal
I provide a fixed fee for that apartment. Once it is agreed, you arrange access with the developer.
- 3
The inspection
I inspect the apartment myself.
- 4
Report and Zoom
The report in English, usually within three working days of the visit. Then we talk it through.
- 5
The developer
You pass the list to the developer to put right.
The report
Written in English, for you, and set out so that a developer can work through it. It records the apartment as it was on the day of the inspection.
- Every item photographed and located by room
- A recommended action for each item
- A summary schedule in English and Hebrew, to pass to the developer
- Recurring defects marked as such, so that the developer finds and corrects every instance
- A list of anything that could not be seen on the day
- A Zoom call to talk it through
The report does not price the repairs: on a new apartment they are the developer's responsibility. You can give it to your lawyer, and to the developer so that the items can be put right. The Hebrew schedule is a translation for convenience, and the English report prevails.
Before the visit
Access is arranged by you or your lawyer, with the developer. This is what I need.
- Access agreed with the developer for the time of the visit, including their consent to the inspection and to photographs
- The apartment complete, cleaned, uncovered and lit, with electricity and water connected, and every room, the parking and the storage open
- The sale plans, any agreed changes and any earlier defect lists, at least three working days before the visit
- A note of anything fitted out by your own designer or contractor, not by the developer
- Any site safety requirements, in advance
Timing, fees and which homes
When
Before you take possession. Be led by your lawyer on the date.
Turnaround
The report usually arrives within three working days of the visit, followed by a Zoom call.
Fees
A fixed fee, quoted for each apartment on its size and complexity. It covers one visit, the report and a Zoom call, and it does not depend on the handover or on the developer's response.
Which homes
High-end new apartments bought from a developer, across the whole of Israel. Buying a second-hand home? See second-hand home inspections.
What a client says.
“Robert did a very thorough assessment of the build quality of the flat and produced a report in English with full photographs which identified a number of areas where remedial action was required.”
32 reviews on Facebook. 100% recommend. Read every review